Call us now on 01638 507 684

Sunbaba

Ecovelocity

 

Description

EcoVelocity 2011 held at Battersea Power Station included the latest technology from the world's leading car manfacturers. 


Ingredients: 

  • Battersea Power Station
  • Purpose built trackway laid down for the event
  • Heras Fencing
  • Crowd Control Barriers
  • Polymesh screen-printed fence wrap (eyeleted)
  • PVC Crowd Control Barriers Covers
  • Cable Ties


Method:

  1. Pre to making the screen-printed wrap its important to ensure the wrap has a sturdy consistency and everything runs smoothly live tests were made by the team before the dish is served using samples ingredients Sunbaba supplied.
  2. Take the screen-printed wrap, and line the purpose built track-way to the edge of heras fencing panels. In order to stop the dressing parting from the fencing serve with cable ties.
  3. Meanwhile, for the crowd control barriers, take the PVC crowd control barrier covers and add to crowd control barriers together with the cable ties.
  4. To serve, make sure the branding is placed in the correct dish destinations at Battersea Power Station.

                        Heras Fencing Wrap